Free check

Depth-bracket QA check before the utility bid summary

For small utility contractors sorting sanitary, storm, and water runs in PDFs and spreadsheets. Check the boxes that are NOT true on the current takeoff to generate a short estimator QA note. Nothing is saved and no email is required.

QA gaps 0

Ready for bid-summary review

Check any gaps that apply to see where the depth-bracket takeoff needs cleanup.

Depth bands

Can every pipe run be sorted without guessing?

Plan traceability

Can the total be defended after bid day?

Bid assumptions

Are production assumptions visible?

Rollup and QA

Will totals survive a final review?

Estimator QA note

Copy this into the bid folder before the final review.

The check finds the gaps. TrenchCalc gives you the repeatable workbook.

Use one depth-bracket sheet, structure log, Bluebeam annotation convention, QA checklist, and bid-summary rollup instead of rebuilding the takeoff workbook every bid.